Project Summary

Wastewater Management
ENVIRONMENTAL IMPACT ASSESSMENT OF THE PROJECT: WASTEWATER TREATMENT PLANT (WWTP) FOR THE MUNICIPALITY OF NEA ZICHNI, SERRES PREFECTURE

Client:  Municipality of Nea Zichni
Year:    1996

ISSUE
The purpose of the project was the Approval of Environmental Permit for the construction of a Waste Water Treatment Plant in the Municipality of Nea Zichni and the required wastewater transmission pipelines.

SOLUTION
The WWTP was constructed in number 2531 estate, which is located 800m southwest of Nea Zichni and occupies an area of 635m2.
The WWTP was designed to serve a population equivalent up to 4.500 habitats (target year 2050).Αποχέτευση
The design of pipelines, pumping stations and WWTP was based on a 40-year horizon, while the selection of electrical and mechanical equipment was based on a 20-year horizon. More specifically, the project included:

In the accounted study the exact locations of the construction works were identified while the current situation was analyzed, investigating the state of the natural and human environment. At the same time significant information was offered with respect to the feasibility of the works along with their analytical description.
 
Finally, the extent and size of the caused environmental annoyance from the construction and operation of the works was described, while appropriate methods to treat environmental impacts during construction and operation phase were provided.

BENEFIT
The project was submitted to the public agency responsible for issuing the required Environmental Permit and contributed in the resolution of wastewater management issues in the Municipality of Nea Zichni.