Project Summary

Wastewater Management
SEWERAGE FINAL DESIGN FOR MUNICIPAL DISTRICTS OF MUNICIPALITY OF IRAKLIA, SERRES PREFECTURE

Client: Municipality of Iraklia
Year: 2004
Budget: 38.460.000€ (2009 prices)

ISSUE
The purpose of the  project was the final design of the:

SOLUTION
The aforementioned communities were served by septic tanks. The produced wastewater was discharged untreated in the broader region resulting in the degradation of the natural environment and the quality of life for local residents.

The table below shows the total peak population of all communities, for each design phase.

Peak Population of Served Communities
Community Population 2001Projected Population in 20 years
Projected Population in 40 years
Iraklia 3.609 4.673 6.050
Valtero 1.335 1.629 1.988
Dasochori 974 1.188 1.450
Psomotopi 217 265 323
Karperi 1.099 1.341 1.636
Kimisi 1.539 1.878 2.291
Lithotopos 698 852 1.039
Limnochori
696 849 1.036
Pontismeno 1.659 2.024 2.470
Chrisochorafa 1.347 1.644 2.005
Simona 70 85 104
TOTAL 13.243 16.42820.392

The design of the project was pursuant to the Greek Presidential Decree 696/74. The design of the pipelines, the pumping stations and the WWTP was based on a 40-year horizon, while the selection of the electrical and mechanical equipment was based on a 20-year horizon. Specifically, the project included:

BENEFIT
The design of the sewer pipelines solved the wastewater problem for communities of Iraklia, Valtero, Dasochori, Psomotopi, Karperi, Kimisi, Lithotopos, Limnochori, Pontismeno, Chrisochorafa and Simona of Municipality of Iraklia.