Project Summary

Solid Waste Management
RECEPTION BED WITH A VOLUME OF 50.000M³ FOR DRIED AND CALCIFICATED SLUDGE FOR THE LANDFILL SITE OF TAGARADES THESSALONIKI
Client: Thessaloniki Water Supply and Sewerage CO.S.A
Time: 2008
Budget 1.110.849€

ISSUE
The purpose of the project was the ΚΛΙΝΗ ΥΠΟΔΟΧΗΣ 50.000M3 ΑΦΥΔΑΤΩΜΕΝΗΣ ΚΑΙ ΑΣΒΕΣΤΟΠΟΙΗΜΕΝΗΣ ΙΛΥΟΣ ΣΤΗΝ Ε.Ε.Λ. ΘΕΣΣΑΛΟΝΙΚΗΣfinal design of the beds for the deposition of produced sludge from the Waste Water Treatment Plant (WWTP) in “Galliko”, for safe temporary storage of the inert and calcificated sludge, until the construction of Sludge Thermal Treatment Plant.

SOLUTION
The produced sludge of the WWTP in “Galliko” – about 135tn/day – accumulates within the WWTP creating health problems (the sludge content is infectious) for workers on the site and residents of the broader region, as well as problems for the natural environment.

The proposed area for the construction of the bed is adjacent to the existing WWTP in Galliko, in a space within the boundaries of the WWTP.

The total capacity of the bed - taking into account the final grade work after the required earthworks, the slopes and the surface quality - is estimated at 50.000m³.

Concisely, the design of the project includes the following:
The leachate is transported through gravity pipelines with a diameter of 315mm to the proposed final wastewater collection chamber, and through a pipeline – which was not part of the present project – is transported to an existing chamber prior to reaching the WWTP.

BENEFIT
The design of the project solved the problem of temporary safe deposition of produced sludge from the WWTP in “Galliko”.