Project Summary

Environmental Protection
FINAL DESIGN AND PREPARATION OF BID DOCUMENTS FOR DITCH ENCASEMENT WORKS IN MUNICIPAL DISTRICT OF KAΤΟ MITROUSIS OF MUNICIPALITY OF KAPETAN MITROUSIS
Client: Municipality of Kapetan Mitrousis
Year: 2003
Budget: 1.570.000€

ISSUE
The purpose of the project was the final design of the required works in order to solve the problems caused by the open ditch (torrent) of Municipal District of Kato Mitrousis.

SOLUTION
The project was required due to the proximity of the ditch to human activities, pollution and aesthetic degradation caused by the termination of the sewers and the disposal of wastewater within the ditch.

The main problems were:

Furthermore, at the perimeter and within the torrent were dumped debris, household solid waste and residues from agricultural activities (pesticides bottles, fertilizer bags, etc). These actions clearly contributed to further deterioration of the water used for irrigation and the environment of the region threatening public health.

The Mitrousis torrent Β Μαλιώκας & Συνεργάτες - Προστασία περιβάλλοντοςdrains the water runoff from the rice fields of the region during the summer months. Additionally, the stormwater runoff of the region is drained within the torrent. The flow was set at 1.50m3/sec after negotiations with the Department of Agriculture in Serres and local irrigation water distributors (TOEB).

The cross section of the ditch encasement was rectangular with dimensions 2.60m x 1.20m. The ditch encasement had an overall length of 1.660m.

The pipeline within the encasement was constructed of reinforced concrete C16/20 with a thickness of 30cm. The installation took place on a concrete base with thickness of 10cm on top of a layer of gravel. Moreover, manholes were constructed for cleaning of the pipeline.

BENEFIT

The design of the ditch encasement works solved the problems caused by the open ditch (torrent) of Municipal District of Kato Mitrousi of Municipality of Kapetan Mitrousis.